Page 1 of 1

MAN5T TTTT build.

Posted: Sun Dec 31, 2006 5:57 pm
by honda_s2000
Hi all,

After about 2 years of browsing TTTT sites in German, and drooling over all the cool stuff, I actually built a TTTT, it only got to a roller state, while testing the touque of the motor, I was using the wrong size worm gear, and managed to basically rip the rear gearbox into peices, this was awfull, and so I tore it down and it was never re-built.

Several months later, I'm there again, this time, it's going to be done properly, I'm selling most of my stuff to pay for this build, so I'm determind that it works out!

So here's the planning part....

So, on a finally cleaned up workbench, far, far away...
Image

some parts were gathered....
Image

Inlcuding my old MAN5T body, the bed is in an awefull state, it will actually be replaced with a styrene one. Using the original side pannels, though.
Image

As you can see, the bed is... dead?
Image

Just a quick comparison, I'm going to have trouble fitting things inside this "huge" MAN5T, but others fit things into unimogs, ever seen one compared to a MAN?
Image
*Gulp*

Anyway, here's the basis of what I'm using...

Custom built brass front axle that I purchased a long time ago.
Image

ZipZap SE servo for the gear reduction box.
Image

"Microantriebe.de" Speed controler.
Image

Receiver
Image

Now, with that all planed out, I have some grounds to start on...

But what about the actual gearbox, the driveline ?

Well, I'm not 100% sure yet, here are a few variations, note, some of these are set out as an "exploded" type view, so you can see what's going on.

This is basically using a slotcar rear axle, driven by a ZipZap Monster Truck bevel gear
Image

Image

Secondly, I thought about using brass hex rod for an axle, see here...
Image

Image

I'd say it's quite efficient using this method actually.
Image

Exploded view
Image

And that's what I decided on, though, the brass hex rod, in place of the axle there, will be replaced with round rod, rather than hex, so it's alot smoother.

I have to wait for 2 days, until the LHS opens again, so I can get some brass rod, I need alot of supplies, as the frame will also be brass. I need to make the gearbox carrier and more.

So stay tuned!